Challenge

  • Power distribution complexity, resulting from the many different ways in which the building is used

  • Demand for secure and reliable electrical power distribution

  • Optimization of the energy efficiency of the whole building

  • Development of a solution in close cooperation with the customer



Solution

  • 8BT1 air-insulated medium-voltage switchgear

  • SIPROTEC protection relays

  • 12 GEAFOL cast-resin transformers

  • Software: SIMARIS design, SIMARIS project, SIMATIC WinCC

  • 32 SIVACON S8 low-voltage switchboards

  • Busbar trunking system SIVACON 8PS

  • 3WL compact circuit breakers

Benefits

  • Expert TIP solution with optimally coordinated components from a single source

  • Complete solution with all components integrated into a central control room

  • Space-saving, secure and reliable power distribution for smooth building operation

  • Particularly energy-efficient electrical power distribution

  • Maintenance-oriented plant planning for high availability and economic feasibility