Data Center, Interxion

Vienna, Austria

Construction of the new cloud and carrier-neutral data center Interxion VIE2, total energy consumption of 8 MW, 2,700 sqm space

  • Integrated planning of electric power distribution using the SIMARIS design software tool

  • Installation of Siemens highly available low- and medium-voltage power distribution systems for an especially safe and reliable power supply


Products & systems by Totally Integrated Power applied

  • Network calculation was performed with SIMARIS design

  • 14 units of the 20 kV gas-insulated medium-voltage switchgear type 8DJH (73 panels)

  • SIPROTEC protection system

  • SICAM substation automation system

  • 16 GEAFOL cast-resin transformers

  • 11 SIVACON S8 low-voltage switchboards (88 panels)

  • Built-in: Protection, switching and measuring devices

  • 2,000 meters of the SIVACON 8PS busbar trunking system, system LXA and BD2A: space-saving, which is particularly sited to data centers, lower fire load (compared to cables)