Santa Isabel Hotel

Europapark Rust, Germany

Construction of a new hotel

  • Sizing of power distribution systems with the planning tool SIMARIS design

  • Use of Siemens products and systems throughout

  • Utmost system availability ensured thanks to integrated engineering and technology for planning and project implementation

  • Continuous project support during planning, construction and commissioning


Products & systems by Totally Integrated Power applied

  • Medium-voltage supply by the gas-insulated 8DJ20 switchgear

  • Low-voltage main distribution using¬†SIVACON 8PT

  • ALPHA distribution boards equipped with components for low-voltage circuit protection

  • Switches & socket outlets from the DELTA line product range

  • GAMMA instabus¬† building control connected to building automation and to Desigo Insight building management